To share learnings from the approaches, challenges and achievements of our members with the wider industry, we develop case studies showcasing best-practice or innovative projects our members have undertaken.
The Big Energy Race: Powering Change Across London’s Workspaces
The Big Energy Race: Powering Change Across London’s Workspaces
All Case Studies
-
Shaftesbury’s Sustainable Retrofit at 22 Ganton Street
11 November 2015
The project exemplifies the company’s proactive approach to asset management and commitment to the long-term sustainability of its buildings. By retaining 99% of the building’s structure and 80% of its façade, Shaftesbury significantly reduced the amount of new materials required and cut construction waste, minimising environmental impacts and generating cost savings.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Shaftesbury Capital
-
Grosvenor’s Sustainable Retrofit at 119 Ebury Street
31 July 2015
119 Ebury Street in Belgravia is the UK’s first listed building to achieve BREEAM Outstanding for its proposed design, the highest possible rating. Grosvenor worked closely with Historic England and Westminster City Council to design a scheme that both protects the historically significant fabric of the residential property and achieves leading sustainability standards.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Grosvenor
-
Refurbishment at St James’
08 May 2015
Bruntwood's refurbishment has enhanced occupier demand and rental income for the building, as well as protecting capital value.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Bruntwood
-
BREEAM Excellent for Legal & General's Refurbishment of 6 Agar Street
01 January 2013
Legal & General Real Asset's major refurbishment project at 6 Agar Street achieved a BREEAM Excellent sustainability rating. Sustainability features are set to reduce absolute CO2 emissions by 60% compared o the existing building and water use by 39% per person.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Legal & General IM Real Assets
-
Land Securities' AHU Refurbishment at Bon Accord
01 January 2013
At Bon Accord shopping centre in Aberdeen, Land Securities has refurbished and improved air handling units. This has contributed to almost £50,000 of annual energy cost savings and an 80% reduction in energy use for heating and ventilation in common parts.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Landsec
-
Transport for London Installs Fuel Cell in New HQ
01 January 2013
Transport for London carried out a major fit-out of its new flagship Head Office in Southwark, including the installation of a fuel cell, to dramatically reduce running costs and improve its environmental performance.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Transport for London
-
Transport for London Pilots the RE:FIT Programme in 22 Head Office Buildings
01 January 2013
TfL played a key role in the Greater London Authority’s successful pilot of the RE:FIT programme, implementing a range of energy saving measures across 22 of its Head Office buildings. These improvements will yield annual energy savings worth £500,000 and cut 2,400 tonnes of CO2 emissions.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Transport for London