    • GN10.1: The fit-out process
    • GN10.2: Alterations and dilapidations
  • OCCUPIER ENGAGEMENT
  • BIODIVERSITY
  • HEALTH & WELLBEING

GN 10.2: Alterations and dilapidations

Guidance Note purpose 

The purpose of this Guidance Note is to provide asset managers, property managers and facilities managers with information when considering sustainability as part of alterations and dilapidation. 

Context 

Leases contain clauses governing how occupier’s alterations are to be dealt with, including whether they require formal consent through a Licence to Alter.  The relevant clauses will generally set out the process to follow, including what is, and what is not, permitted.  This may include, for example, structural alterations, and who is liable for fees in connection with the process. 

A Schedule of Dilapidation is generally prepared by a Chartered Building Surveyor and identifies; relevant lease obligations, alleged breaches of those obligations, proposed remedial works and the estimated associated cost in rectifying.  They are typically prepared towards the end of a lease term and can result in a negotiated financial settlement or the occupier undertaking an agreed scope of repair and reinstatement works. 

There are variations to the associated legal frameworks for alterations and dilapidations across the UK constituent countries. 

While sustainability is considered in various ways during a property’s fit-out, there are opportunities to reference alterations and dilapidations as part of a lease, and to consider sustainability issues throughout the alterations process. 

Importance 

Failure to understand the lease clauses associated with alterations can lead to delays in the process, misunderstandings and negative impacts on the asset manager’s interest where, for example, alterations cannot be removed at the end of the lease.  In multi-let properties, there can also be impacts on other occupiers, or common areas through, for example, changes to common heating, cooling and ventilation system. 

It is also important to consider the potential effect of alterations on the sustainability performance of a property.  This may include, for example, negative impacts on broader ratings and certifications achieved for a property. 

The dilapidation position should be considered in advance of the lease termination date so that any reinstatement provisions and notices can be taken into account.  Inspections may require specialist input and, where valuation evidence is required to support a claim, time will need to be allowed for this process.  An initial review is often instigated 12-18 months prior to lease termination. 

The dilapidation process also needs to take in to account the impact of any repair and reinstatement works on a property’s sustainability performance.  For example, Energy Performance Certificate (EPC) ratings: 

  • The EPC obligations fall to the asset manager as part of re-letting the accommodation.  There may be lease clauses that need consideration in this regard as well as potential arguments around diminution valuations if the EPC is made worse through the reinstatement process. 
  • Options around retaining elements of occupier fit-out rather than requiring reinstatement also needs to consider the impact of EPC’s, alongside the avoidance of waste by retaining elements of fit out where possible. 

Responsibilities & Interests

The table below summarises the key activities associated with the license for alterations process, and highlights where asset managers, property managers and facilities managers are likely to have a responsibility or specific interest. 

  • AM - Asset Manager
  • PM - Property Manager
  • FM - Facilities Manager

1. The license for alterations process 

Stakeholder:

2. The dilapidations process 

Stakeholder:

Show less

How to

Intro

Toggle

The license for alterations and dilapidations processes are often coordinated by the property manager in collaboration with asset managers and occupiers.  

1. The license for alterations process

Toggle

The license for alterations process involves the definition and review of an occupier’s proposals for alteration.  Approval instructions should be sought from an asset manager, based on a recommendation of the approach from third party specialists, for example building surveyors. 

Throughout the approval process, a property manager should liaise with all parties, and manage the overall timeline through to documenting the Licence to Alter. 

Technical review 

Where third party specialists are involved, a building surveyor may be instructed to coordinate the review of technical elements as part of delivering a single technical review.  This will lead to a recommendation or approval of the proposal for appending to the Licence to Alter. 

As part of the technical review, the building surveyor will engage with the occupier’s technical team to seek additional information setting out the proposals in sufficient detail to enable a full assessment.   

It is important to understand the wider sustainability impacts on the property as a result of the alterations.  For example, an assessment of any changes in the property’s energy performance, such as from alteration to heating, ventilations and air-conditioning systems, will be needed to enable an assessment of whether the current Energy Performance Certificate rating will be negatively affected. 

Wider environmental, social and governance aspects should also be considered.  For example, changes to shared occupancy areas may affect the well-being of other occupiers.  Similarly, the installation of electric vehicle charging facilities may affect transport arrangements for property users. 

Re-instatement 

As part of the technical review, it may be necessary to agree how a property will be reinstated on termination of the lease. 

While the lease and Licence to Alter will generally contain clauses covering this, a more detailed technical understanding may be needed to understand how this will take place in practice, ensuring the existing and proposed drawings clearly show the scope of the works and that sustainability considerations are factored in. 

Approval recommendations and inspections 

When the technical review process is complete, the building surveyor will prepare an approval recommendation and collate the agreed information to pass on to solicitors for incorporation within the Licence to Alter.  A solicitor will then finalise the documentation and ensure fees are settled. 

Subject to the scale of the alterations, interim inspections may be appropriate to monitor the works, ensuring compliance with the approved documentation however there will generally be a single final inspection on completion to ensure the completed works are in line with the approved documents.   

A package of information should also be sought to ensure an accurate record of information is held for health & safety reasons along with all relevant commissioning and statutory certification. 

2. The dilapidations process

Toggle

In terms of fit-out works, and any subsequent alterations undertaken during the tenancy, an asset manager will likely require that, at the end of the lease, an occupier restores the property to its original state, or pays the cost of doing so. 

The process of removing previous tenant’s fit-out and alterations, refurbishing the space for marketing, and the subsequent fit-out by the new incoming tenants can have significant sustainability impacts, in terms of waste, material use, disruption and cost. 

Owners and occupiers can proactively take a more responsible approach, and seek opportunities to reduce these negative impacts for both parties by decreasing the need to carry out unnecessary strip-out and refurbishment works. 

The way in which reinstatement and dilapidations provisions within lease agreements are drafted could help support such an approach. For example: 

Payment covenant 

To avoid the disruptive and resource intense process of strip-out and refurbishment, asset managers may wish to consider a covenant providing an option to require a payment from occupiers rather than requiring the occupier to carry out reinstatement works. 

Upfront payments 

Occupiers could make an upfront payment as part of the licensing of alterations if this was accompanied by an agreement that there would be no requirement to reinstate the works at the end of the lease.  The asset manager could address these costs as part of refurbishment, as long as suitable lease provisions were made in relation to re-instatement resulting from damage. 

Return to shell and core 

Most leases require occupiers to return to ‘Category A’ arrangements.  This typically includes, for example, raised floors and suspended ceilings, distribution of mechanical and electrical services, internal surface finishes and blinds. 

An alternative could involve options for occupiers to reinstate the space to shell and core.  In this case it would be relatively easy to define the obligations and would prevent occupiers reinstating elements that will ultimately be discarded. 

End-of-tenancy audits 

  • End-of-tenancy audits could be undertaken to identify opportunities to retain or upcycle/recycle/re-use fit-out elements off-site. 
  • The audit cost could be met by the occupier and carried out by a suitably qualified independent surveyor. 
  • Owners and occupiers could agree on opportunities to be taken, which could result in reduced costs, waste and minimise disruption. 

Backstop provisions in the lease could allow for more typical reinstatement arrangements should agreement not be reached. 

Marketing for incoming occupiers 

Asset managers and their letting agents should consider marketing space prior to the previous fit-out being stripped out. Incoming occupiers may prefer reusing or adapting elements of the previous fit-out on grounds of cost reduction, expediency and corporate sustainability commitments. 

  • BBP How to guide: alterations and dilapidation

    pdf | 70.3 KB

Related Guidance Notes 

The following Guidance Notes contain related information: 

  • GN1.2: An environmental compliance register 
  • GN2.1: An asset register 
  • GN6.3: Site Waste Management Plans 
  • GN 6.4: Waste management opportunities
  • GN6.5: Waste Management during Refurbishment &Fit-out 
  • GN10.1:The fit-out process 
  • GN11.1: Building User Guide 

Additional Resources

  • Better Building Partnership: Green Lease Toolkit 
  • Better Building Partmership:  Responsible Fit-out Toolkit 
  • BBP Acquisitions Toolkit 
  • BBP Low Carbon Retrofit Toolkit 
  • RICS: License for Alterations in Commercial Property
  • RICS:  Dilapidations in England and Wales

RESPONSIBLE PROPERTY MANAGEMENT TOOLKIT

  • HOW TO USE THIS TOOLKIT
  • MANAGING ENVIRONMENTAL RISK
  • OPERATIONAL MANAGEMENT
  • RATINGS & CERTIFICATIONS
  • ENERGY
  • WATER
  • WASTE
  • TRANSPORT
  • SOCIAL VALUE
  • SUPPLY CHAIN MANAGEMENT
  • FIT-OUT & ALTERATIONS
    • GN10.1: The fit-out process
    • GN10.2: Alterations and dilapidations
  • OCCUPIER ENGAGEMENT
  • BIODIVERSITY
  • HEALTH & WELLBEING

Solutions Scrapbook

M J Mapp’s Collaborative Recycling Programme in Chinatown

A collaborative approach to waste management in the Chinatown portfolio that M J Mapp manages for Shaftesbury has delivered both environmental and social benefits. The introduction of recycling facilities alongside a targeted occupier engagement programme has resulted in improved behavioural change, reducing incidents of fly-tipping and improving conditions for people using the service areas. In turn, this has freed up more of the cleaning team’s time to focus on public areas for visitors. M J Mapp is now exploring opportunities to collaborate with Chinatown occupiers on other win-win initiatives.

Read the case study here.

Previous pageGN10.1: The fit-out process
Page 57 of 70
Next pageOCCUPIER ENGAGEMENT

Connect with us

The BBP is a collaboration of leading property owners who are working together to improve the sustainability of commercial buildings.

Contact Us

Managing Agents Partnership

The Managing Agents Partnership is a collaboration of the UK’s leading property managers who are committed to improving the sustainable management of commercial property assets

Managing Agents Partnership

All Resources

Connect with us

Twitter LinkedIn

Signup for our newsletter

Subscribe to our mailing list

* indicates required

© Better Buildings Partnership 2025

  • Credits
  • Terms & Conditions
  • Privacy policy
  • Cookie policy
  • Accessibility

Crafted by Un.titled